
Why we inspect at every station
Final random sampling catches problems after they have already been built into a whole batch. We work the other way around. IPQC, in-process quality control, means every station checks its own output before it passes to the next one, so a warped sheet never reaches the cutting press and a misaligned print never reaches the carton.
The result is a shipping yield of 99.7% or better. For the rare unit that still arrives defective, we replace it 1:1. For a brand selling a CPSIA compliant play mat or an ASTM F963 play mat in the US, that consistency is what keeps returns, reviews and retailer audits under control.
What we check at each station
Foaming
Color against your approved standard, sheet thickness, surface condition and dimensional stability before release to cutting.
Cutting
Tile dimensions, interlocking tooth fit and edge quality on every tile.
Lamination
Film adhesion, print registration and pattern alignment across tiles.
Packing
Piece counts, carton marks, barcodes, FBA labels and packaging against the approved standard.
How in-process inspection stops the defects buyers fear
Warping, peeling, gaps and odor are the issues that turn into returns. Each one has a station where it can be caught early.
Warping
End-of-line sampling finds curled tiles only after a whole batch has been cut from unstable sheets, when the only options are rework or shipping them anyway.
Warping: how we prevent it
Sheets are checked for stability at the foaming station, so unstable foam never reaches the cutting press.
Peeling and gaps
A few cartons are opened at the end of production. Loose film or oversized teeth in the rest of the batch go out the door unseen.

Peeling and gaps: how we prevent it
Film adhesion is checked at lamination and tooth fit at cutting, on every tile rather than a sample.
Odor
Material is accepted on a supplier certificate, and a smell problem is discovered by the end customer.
Odor: how we prevent it
Our controlled formula keeps formamide under 2 ppm, and test reports back the material claims on your listing.
Tested to the standards your market requires
Our mats are tested to the main US and EU requirements for children’s products. Reports are available on request for your compliance file.
| Market | Standard | What it covers | Report |
|---|---|---|---|
| United States | CPSIA | US federal requirements for children’s products, including lead and phthalate limits | Available on request |
| United States | ASTM F963 | US standard consumer safety specification for toy safety | Available on request |
| United States (California) | CA Prop 65 | California rules on listed chemicals and consumer warnings | Available on request |
| European Union | EN 71 | European toy safety standard series | Available on request |
| European Union | REACH | EU regulation on chemicals, including restricted substances | Available on request |
Applicable tests depend on the material and design. We confirm the report set for your product with your quotation.

Test reports, on request
Test reports for ASTM F963, CPSIA, CA Prop 65, EN 71 and REACH are available on request. Ask for the reports that match your market, or request the full compliance pack for your product.
US toy safety: ASTM F963 and CPSIA
Reports for the US market, tested to the standards your compliance team checks first.
California Prop 65
Documentation for programs that sell into California.
EU: EN 71 and REACH
Reports for programs shipping to European markets.
Questions about quality control and testing
What does IPQC check at each production station?
IPQC, in-process quality control, means each station checks its own output before passing it on. At Komat, foaming checks color against your approved standard, sheet thickness, surface and dimensional stability; cutting checks tile dimensions, tooth fit and edge quality; lamination checks film adhesion, print registration and pattern alignment; and packing checks piece counts, carton marks, barcodes and labels. Every tile is checked, not a sample, so a fault stops at the station where it appears.
Why is in-process inspection better than end-of-line sampling?
In-process inspection catches a defect before it is built into a whole batch, while end-of-line sampling finds it only after production is finished. If curled tiles are spotted in a final sample, the whole run has already been cut from unstable sheets, and the only options are rework or shipping anyway. Because Komat checks every tile at every station, unstable foam never reaches the cutting press and a misaligned print never reaches the carton.
How do I get third-party test reports for my play mat program?
Ask us for the compliance pack and tell us your product and target market. Komat’s mats are tested to ASTM F963, CPSIA, Prop 65, EN 71 and REACH, and we send the reports that match your market together with our inspection criteria. Which tests apply depends on the material and design, so we confirm the exact report set for your product with your quotation. You can request the compliance pack here.
What does a 99.7%+ shipping yield mean?
A shipping yield of 99.7% or better means that at least 997 of every 1,000 units we ship pass our inspection criteria, so no more than about 3 in 1,000 fall short. Komat reaches that level by inspecting every tile at every station rather than sampling at the end. For the rare unit that still arrives defective, we replace it 1:1, which keeps returns, reviews and retailer audits under control for your brand.
What does formamide under 2 ppm mean?
Formamide under 2 ppm means the foam contains less than 2 parts per million of formamide, or under 2 milligrams per kilogram of material. Formamide is a residue that can be left in EVA foam by the foaming process and is a common cause of chemical odor in low-cost mats. Komat controls it at the formula stage rather than accepting material on a supplier certificate alone, and third-party test reports back the claims on your listing.
No matching questions.


